Taicang Golden Concord Garbage Incineration Power Co.

Taicang, Jiangsu Province, China

a.k.a./f.k.a.:Taicang Xiexin
CHWMEG Report Number:H818.0
*Location Map:Google Maps
Review Program
(Visit Date):

There is 1 more review conducted prior to 2019 not shown.
EPA ID:N/A
Description of Services:The facility operations include incineration of nonhazardous domestic wastes and some industrial wastes; additionally, power is generated using heat released from incineration. The wastes are primarily received via dump truck or city garbage truck and are transferred into a waste storage area in the main operations building. The storage period in the waste storage area is generally 2 days in summer and 3-4 days in winter. The heat generated during incineration process is used as power to produce steam by boilers and the steam is fed to gas turbine unit for power generation. The main residue from incineration of domestic waste is slag.
Description Date:2007 Facility Review Program
Facility Location Map:

*CHWMEG, Inc. cannot guarantee the accuracy of the maps. Maps are for informational purposes only. The latitude and longitude for this map are from the most recent CHWMEG facility review.
CHWMEG's facility reviews assist its members with the management of their environmental / waste stewardship, sustainability, corporate responsibility programs. These are essential elements of any valid environmental, social justice, governance (E, S, G or ESG) initiatives.