Elemental Environmental Solutions

Arkadelphia, AR, USA

a.k.a./f.k.a.:Reynolds Metals; Alcoa Gum Springs Plant
CHWMEG Report Number:H1751.3
Member Interest:This facility is currently being tracked by 21 members
(Member interest is not related to how many members use this facility.)
*Location Map:Google Maps
Review Program
(Visit Date):
2023 (4/26/2023)
2022 (4/5/2022)
2020 (6/25/2020)
There is 1 more review conducted prior to 2019 not shown.
Description of Services:The facility operates two adjacent and identical kilns to treat spent aluminum potliner waste (K088), a byproduct of the process that separates elemental aluminum from raw alumina. There is an onsite RCRA Subtitle C landfill for disposal of the incinerator residuals and commercial wastes. The facility also processes other solid and liquid waste, provided it is in the proper BTU range.
Description Date:2023 Facility Review Program
Facility Location Map:

*CHWMEG, Inc. cannot guarantee the accuracy of the maps. Maps are for informational purposes only. The latitude and longitude for this map are from the most recent CHWMEG facility review.
CHWMEG's facility reviews assist its members with the management of their environmental / waste stewardship, sustainability, corporate responsibility programs. These are essential elements of any valid environmental, social justice, governance (E, S, G or ESG) initiatives.