This facility is reportedly closed.

CEMEX Inc.
Miami, FL, USA

Printer Friendly Version
a.k.a./f.k.a.:Rinker Materials, CSR; CS Rinker
CHWMEG Report Number:H203.1
Member Interest: This facility is currently being tracked by 3 members
(Member interest is not related to how many members use this facility.)
*Location Map:Google Maps
Review Program
(Visit Date):

There are 2 more reviews conducted prior to 2014 not shown.
Description of Services:2013 Update: Facility is no longer receiving contaminated soil. Fuel blending of nonhazardous used oils and off-specification fuels.  Product is used as fuel in the co-located soil processing kiln, and some is used in the cement kiln.

The facility also conducts contaminated soil processing in a rotating kiln. Treated soil is used as a raw material (silica) in the production of cement.

Description Date:2009 Facility Review Program
Facility Location Map:

*CHWMEG, Inc. cannot guarantee the accuracy of the maps. Maps are for informational purposes only. The latitude and longitude for this map are from the most recent CHWMEG facility review.