NOTE: CHWMEG Inc. is not affiliated with this facility in any way. 
CHWMEG Inc. does not approve any facilities. 
 
 

Facility Detail

Taicang Golden Concord Garbage Incineration Power Co.
(a.k.a./f.k.a.: Taicang Xiexin)
CHWMEG Report Number: H818.0


City, State/Prov, Country:Taicang, Jiangsu Province, China

Member Interest: This facility is currently being tracked by 1 member
(Member interest is not related to how many members use this facility.)

*Location Map:Google Maps

Review Program
(Visit Date):

There are 1 more reviews conducted prior to 2012 not shown.

Description of Services:The principal operations onsite include incineration of nonhazardous domestic wastes and some industrial wastes; additionally, power is generated using heat released from incineration. The wastes are primarily received via dump truck or city garbage truck and are transferred into a waste storage area in the main operations building. The storage period in the waste storage area is generally 2 days in summer and 3-4 days in winter. The heat generated during incineration process is used as power to produce steam by boilers and the steam is fed to gas turbine unit for power generation. The main residue from incineration of domestic waste is slag.

Description Date:2007 Facility Review Program

Facility Location Map:

*CHWMEG, Inc. cannot guarantee the accuracy of the maps. Maps are for informational purposes only. The latitude and longitude for this map are from the most recent CHWMEG facility review.