NOTE: CHWMEG Inc. is not affiliated with this facility in any way. 
CHWMEG Inc. does not approve any facilities. 
 
 

Facility Detail

Systech Environmental Services
(a.k.a./f.k.a.: Lafarge)
CHWMEG Report Number: H072.10


City, State/Prov, Country:Paulding, Ohio, USA

Member Interest: This facility is currently being tracked by 33 members
(Member interest is not related to how many members use this facility.)

*Location Map:Google Maps

Review Program
(Visit Date):
2018 (3/1/2018)
2015 (3/9/2015)
2013 (9/17/2013)
There are 8 more reviews conducted prior to 2013 not shown.

Description of Services: The Facility primarily accepts hazardous and non-hazardous wastes (including used oil) for on-site fuel blending. The waste-derived fuel (WDF) is then piped to the co-located Lafarge cement plant for energy recovery in cement production.

Description Date:2018 Facility Review Program

Facility Location Map:

*CHWMEG, Inc. cannot guarantee the accuracy of the maps. Maps are for informational purposes only. The latitude and longitude for this map are from the most recent CHWMEG facility review.